Contact: 91-7060351888, info@pebtrade.com
In Rombild, a pre-engineered building (PEB) is designed and fabricated using best suited inventory of raw materials available from all sources and manufacturing methods that can efficiently satisfy a wide range of structural and aesthetic design requirements. Within some geographic industry sectors these buildings are also called pre-engineered metal buildings (PEMB).
Other forms of primary framing can include trusses, mill sections rather than three-plate welded, castellated beams, etc. The choice of economic form can vary depending on factors such as local capabilities (e.g. manufacturing, transportation, construction) and variations in material vs. labour costs.
Typically, primary frames are 2D type frames (i.e. may be analyzed using two-dimensional techniques). Advances in computer-aided design technology, materials and manufacturing capabilities have assisted a growth in alternate forms of pre-engineered building such as the tension fabric building and more sophisticated analysis (e.g. three-dimensional) as is required by some building codes.
Cold formed Z- and C-shaped members are mostly used as secondary structural elements to fasten and support the external cladding.
Roll-formed profiled steel sheet, wood, tensioned fabric, precast concrete, masonry block, glass curtain wall or other materials are used for the external cladding of the building.
In order to accurately design a pre-engineered building, our engineers consider the clear span between bearing points, bay spacing, roof slope, live loads, dead loads, collateral loads, wind uplift, deflection criteria, internal crane system and maximum practical size and weight of fabricated members.
Our pre-engineered buildings can be adapted to suit a wide variety of structural applications. Our efficiently designed pre-engineered building can be lighter than the conventional steel buildings by up to 30%. Lighter weight equates to less steel and a potential price savings in structural framework.
Promptness is crucial in leading a victorious life. How we start each morning determines that day's victory or defeat. It's important that we resolve to win in the morning and begin our work with an energetic spirit. In Rombild, I consider my ability to arouse interest among my people, the noblest resource I possess. I believe that the best way to develop ambition in a person is by appreciation and encouragement. I also believe in giving a person motivation to work. So I am restless to applause but hesitant to criticize. Criticism throws negative energy out in the universe for all. And what we put out is what we get back....
Frame Type | other : Lean To |
Standard | AISC2005/IS2062 |
Color Of Main Structure | Choice Of Client |
Items Included | ,Roofing,Column,Rafters,Purlin,Cladding,Sky light panel,Metal Flashing,Hardware,Anchor bolts,Louvers,Sag rods,Bracing,down pipe,Roof Insulation,window,flat board,Puff panel |
Main Structure Steel Grade | E300 |
Purlin Material | HR |
Roofing Sheet | PPGL |
Wall Cladding | PPGI |
Design Software | other : Auto Cad/Tekla/Staad Pro |
Production Capacity | 2000 MT |
Erection Charge | Inclusive |
Application | other : Factory/Warehouse/Workshop/Showrooms |
Lead Time | 30 |
Trademark | Rombild |
Clear height | Customize |
Building width max | Customize |
Brick wall height | Customize |
HSN Code | 9406 |
Warranty Period | 1 Year |
MOQ ( Square Feet ) | 2000 |
Add a review
Your email address will not be published. Required fields are marked