Contact: 91-7060351888, info@pebtrade.com

ALL CATEGORIES

Prefabricated Lean To Warehouse

Features

  • Frame Type: Lean To
  • Standard: AISC2005/IS2062
  • Color of main structure: Choice Of Client
  • Items Included: ,Roofing,Column,Rafters,Purlin,Cladding,Sky light panel,Metal Flashing,Hardware,Anchor bolts,Louvers,Sag rods,Bracing,down pipe,Roof Insulation,window,flat board,Puff panel
  • Main Structure Steel Grade: E300
  • Application: Factory/Warehouse/Workshop/Showrooms
385/Square Feet
MOQ : 2000Square Feet

Total INR770000(GST extra) Lead Time 30 Days

Prefabricated Lean To Warehouse

In Rombild, a pre-engineered building (PEB) is designed and fabricated using best suited inventory of raw materials available from all sources and manufacturing methods that can efficiently satisfy a wide range of structural and aesthetic design requirements. Within some geographic industry sectors these buildings are also called pre-engineered metal buildings (PEMB).

Other forms of primary framing can include trusses, mill sections rather than three-plate welded, castellated beams, etc. The choice of economic form can vary depending on factors such as local capabilities (e.g. manufacturing, transportation, construction) and variations in material vs. labour costs.

Typically, primary frames are 2D type frames (i.e. may be analyzed using two-dimensional techniques). Advances in computer-aided design technology, materials and manufacturing capabilities have assisted a growth in alternate forms of pre-engineered building such as the tension fabric building and more sophisticated analysis (e.g. three-dimensional) as is required by some building codes.

Cold formed Z- and C-shaped members are mostly used as secondary structural elements to fasten and support the external cladding.

Roll-formed profiled steel sheet, wood, tensioned fabric, precast concrete, masonry block, glass curtain wall or other materials are used for the external cladding of the building.

In order to accurately design a pre-engineered building, our engineers consider the clear span between bearing points, bay spacing, roof slope, live loads, dead loads, collateral loads, wind uplift, deflection criteria, internal crane system and maximum practical size and weight of fabricated members.

Our pre-engineered buildings can be adapted to suit a wide variety of structural applications. Our efficiently designed pre-engineered building can be lighter than the conventional steel buildings by up to 30%. Lighter weight equates to less steel and a potential price savings in structural framework.

Promptness is crucial in leading a victorious life. How we start each morning determines that day's victory or defeat. It's important that we resolve to win in the morning and begin our work with an energetic spirit. In Rombild, I consider my ability to arouse interest among my people, the noblest resource I possess. I believe that the best way to develop ambition in a person is by appreciation and encouragement. I also believe in giving a person motivation to work. So I am restless to applause but hesitant to criticize. Criticism throws negative energy out in the universe for all. And what we put out is what we get back....
  

Frame Type other : Lean To
Standard AISC2005/IS2062
Color Of Main Structure Choice Of Client
Items Included ,Roofing,Column,Rafters,Purlin,Cladding,Sky light panel,Metal Flashing,Hardware,Anchor bolts,Louvers,Sag rods,Bracing,down pipe,Roof Insulation,window,flat board,Puff panel
Main Structure Steel Grade E300
Purlin Material HR
Roofing Sheet PPGL
Wall Cladding PPGI
Design Software other : Auto Cad/Tekla/Staad Pro
Production Capacity 2000 MT
Erection Charge Inclusive
Application other : Factory/Warehouse/Workshop/Showrooms
Lead Time 30
Trademark Rombild
Clear height Customize
Building width max Customize
Brick wall height Customize
HSN Code 9406
Warranty Period 1 Year
MOQ ( Square Feet ) 2000

Review for Prefabricated Lean To Warehouse

Add a review

Your email address will not be published. Required fields are marked

Your rating*